The spring support and hanger foundation fence is set on the basis of the construction elevator to protect the cage and counterweight. A solid ceiling is set on the upper part of the feed port to withstand heavy objects. The fence door is equipped with a mechanical or electrical interlocking device, and there is a cable recovery drum inside the fence. The accessories and ground operation box of the construction elevator are placed inside the fence. Key points for the operation of the construction elevator The construction elevator should be a dual-purpose elevator for people and goods. Its installation and disassembly work shall be the responsibility of the team that has obtained the disassembly and assembly qualification certificate issued by the construction administrative department, and shall be operated and maintained by trained personnel who have obtained an operation certificate. The foundation should be cast with a concrete foundation, and its bearing capacity should be greater than, and the allowable deviation of the surface flatness of the foundation is, and there should be drainage facilities.
Technical requirements for spring support and hanger foundation fence
The spring support and hanger foundation fence is set on the basis of the construction elevator to protect the cage and counterweight. A solid ceiling is set on the upper part of the feed port to withstand heavy objects. The fence door is equipped with a mechanical or electrical interlocking device, and there is a cable recovery drum inside the fence. The accessories and ground operation box of the construction elevator are placed inside the fence. Key points for the operation of the construction elevator The construction elevator should be a dual-purpose elevator for people and goods. Its installation and disassembly work shall be the responsibility of the team that has obtained the disassembly and assembly qualification certificate issued by the construction administrative department, and shall be operated and maintained by trained personnel who have obtained an operation certificate. The foundation should be cast with a concrete foundation, and its bearing capacity should be greater than, and the allowable deviation of the surface flatness of the foundation is, and there should be drainage facilities.
The overall stability of the elevator should be guaranteed, and the distance from the longitudinal line of the elevator guide frame to the outer wall of the building should be selected with a smaller installation size. When installing the guide frame, the elevator should be measured and calibrated in two directions with a theodolite, and the verticality allowable deviation of the spring support and hanger is its height. The free height of the top of the guide frame, the distance between the guide frame and the attached wall, the distance between the two attached wall connection points of the guide frame and the height of the lowest attached wall point shall not exceed the exit regulations. The dedicated switch box of the elevator should be located near the base frame in a convenient location for operation. The power feeding capacity should meet the requirements of direct start-up of the elevator. The box should be equipped with short-circuit, overload, phase sequence, phase failure and zero position protection devices. Stable guardrails should be installed around the elevator cage. The platform passages on each floor should be flat and firm. Guardrails and protective doors should be installed at the entrances and exits. There should be no obstacles that endanger the operation around the entire stroke. When the elevator is installed in the middle of the shaft inside the building, a closed barrier should be set up around the shaft wall within the entire stroke. Elevators installed in dark places or working at night should be equipped with sufficient lighting and bright floor number sign lights throughout the entire stroke.